Solar Foundation Risk Assessment And Mitigation

Solar Foundation Risk Management And Mitigation

image002

 Recovering value and performance by addressing foundation failure vulnerability

 

For commercial and utility scale facilities, the comparative costs of various degrees of foundation risk abatement can be thought of in the following terms:

  • The incremental cost of experienced geotechnical site assessment, foundation design and early project involvement is thousands of dollars.
  • The cost of geotechnical risk assessment for suspect foundations is about the cost of a typical geotechnical site assessment.
  • The cost of foundation risk abatement is comparative to the materials and installation cost of the original foundations.
  • The cost of foundation failure remediation encompasses racking and modules and can approach the initial value of the installation.

 

image008AquaSoli’s perspective on foundation failure and ground component vulnerability stems from 10 years, 1000 projects and 10 gigawatts of experience.  Our work in this area grows with the in-service history of commissioned facilities.  Operational time increases likelihood that a latent foundation risk is actualized by the triggering atmospheric, climatic, and geotechnical conditions.

AquaSoli has a number of tools for addressing risk mitigation:

  • Our baseline understanding of foundation performance and vulnerability comes from designing with most major racks and foundation configurations in all terrains and environments.
  • Over the last 10 years, AquaSoli has compiled an extensive database of empirical design parameters from more than 1000 projects, including foundation remediation.
  • In-house laboratory facilities allow us to model soil profiles, site variables, and foundation reactions, to help replicate real world conditions for testing failure modes.
  • Typical foundation risk and failure mitigation projects add to our body of experience.

 image006

With experience in failure mode analysis and deploying mitigation strategies, AquaSoli offers cost effective alternatives for risk reduction.  Mitigation is usually a fraction of the cost of failure remediation.  Timely implementation can alleviate the performance and financial liability of unquantified risk.  AquaSoil provides risk valuation, mitigation design and deployment, remediation design and construction supervision.  In addition, we will certify the performance of our corrective action for existing facilities.

image004Want to learn more? – Contact us at info@aquasoli.com or call +1 415 230 2062

Integrated Solar Ground Component Management

IMG_3214Integrated Solar Ground Component Management

Project enhancement through integrating and coordinating the tasks that affect foundation cost and performance

AquaSoli applies a systems approach to integrate the interdependent facets of solar ground component design, coordinating execution to ensure foundation reliability.

 

The ground component is comprised of the following elements:

  • Geotechnical evaluation
  • Civil design
  • Rack selection and layout
  • Foundation design
  • Civil ground work
  • Foundation installation

IMG_7503DSCF0282100_0292

 

 

These elements are often treated as discrete components.  However, they are intimately interdependent.  Foundation failure can be caused by site civil design, and inexpensive rack selection can drive the need for expensive foundations.

 image017By integrating and coordinating the ground component, AquaSoli drives success, profit, reliability and value.  For instance, accurate geotech leads to accurate foundation design and minimizes issues during foundation installation.  Our systems approach incorporates an optimized foundation design, integrated with civil work, and coordinated through installation.  Design accuracy reduces materials and deployment costs.  Facet coordination ensures task synergism and avoids interference.  Accuracy in site definition and design lowers bids by instilling installer confidence.  Schedule and change order control increases profits.  Facility reliability increases value.

 Projects integrated by AquaSoli avoid:

  • Expensive change orders in the construction phase
  • Project delays caused by design modifications required during construction
  • Costly over designed foundations
  • Failure vulnerability based on inadequate site data
  • Foundation failure due to design and installation defects and impacts from related ground component facets

Want to learn more? Send us an email at info@aquasoli.com or call +1 415 230 2062.